Work Allocation & Balance
Workload distribution, assignment fairness, and team balance metrics
Workload Balance Score
87%
+5%
Well-balanced distribution
good
Mission Concurrency
2.0
-0.2
Optimal multitasking level
good
Overtime Hours
9.1%
-2.1%
Below threshold
good
Leave Coverage Ratio
1.8x
+0.2
Adequate backup coverage
good
Workload Distribution
Hours allocated per team vs average
Mission Concurrency Rate
Average simultaneous missions per staff
Overtime Percentage
Overtime hours as % of regular hours
Assignment Metrics
Current allocation statistics
Fairness Score
84%
Avg Missions/Staff
2.0
Staff on Leave
12
Backup Available
22
Workload Balance87%
Key Insights
Balanced Workload
87% workload balance score indicates fair distribution across teams with minimal variance from average allocation.
Sustainable Pace
Overtime at 9.1% and concurrency at 2.0 missions per staff demonstrate sustainable workload without burnout risk.